Paseo del Volcan Extension

This project will be an extension of Paseo del Volcan from Iris Boulevard to U.S. 550. The following is funding information and a schedule related to this project.

Funding Information
The city was previously awarded a grant from the New Mexico Department of Transportation (NMDOT) via federal funds for this project.  To utilize any portion of this grant, the city must provide a 20% match. 

On March 5, 2009, the Mid-Region Council of Governments (MRCOG) awarded the city $14 million of its American Recovery and Reinvestment funding for this project.

On July 15, 2009, bids were opened for this project with Mountain States Constructors receiving approval to construct this extension for approximately $16.54 million.

The funding for the costs related to this project will come from the MRCOG money, with the remaining need coming from the previously awarded NMDOT grant.  The match requirement to use the NMDOT grant will come from a general obligation road improvement bond that was passed by voters on March 10, 2009.

Construction on this extension is anticipated to begin in August of 2009 and last until January/February of 2011.

Existing Roadway
3.9 miles of Paseo del Volcan is already in place and is located between Unser and Iris Boulevards. It provides access to Rio Rancho City Hall, the Santa Ana Star Center, forthcoming V. Sue Cleveland High School, and future projects in the City Center area. 

Map
View map (PDF) of where extension project will take place.

Questions
For additional information please contact city Project Manager Jamie Marrufo at 505-891-5016.

Time line 
Description Time line
Preliminary to Final Design 343 days
01/17/08 - 04/29/09
General Coordination / Project Team Meetings
  • Project kickoff meeting
  • Existing data / report and Field Information Gathering
  • General project coordination
  • Coordination with agencies (SSCAFCA, NMDOT, & COE)
325 days
01/14/08 – 04/10/09
Drainage Analysis and Report
  • Collection and review of existing drainage reports
  • Preparation of preliminary drainage report and review by agencies
  • Preparation of final drainage report
  • Preparation of 404 permit application and review with UACOE
  • Coordination of drainage tasks with City of Rio Rancho, SSCAFCA, NMDOT, & UACOE
338 day
01/14/08 - 04/29/08
Aerial Mapping and Location Surveys
  • Setting panels in the field
  • Aerial Mapping and processing
  • Location surveys
49 days
01/07/08 - 03/13/08
Preliminary Roadway Horizontal and Vertical Alignment Selection 45 days
03/14/08 - 05/15/08
Bridge Superstructure Type Selection Report
  • Venada Arroyo Bridge
  • Camino Encantas Bridge
  • Enchanted Hills Blvd Bridge
  • Encantado Channel / multi-use trail bridge
45 days
05/16/08 - 07/17/08
Traffic Analysis and Documentation 59 days
03/03/08 - 05/22/08
Plan Production and Review Meetings
  • 65% complete design plans submittal
  • 65% complete design review and hold review meeting
  • 90% compete design plans submittal
  • 95% complete design review and hold review meeting
  • 95% complete design plans submittal
  • 95% complete design review and completed review meeting
  • Final plan set submittal
381 days
05/16/08 - 06/12/09
Environmental Tasks
  • Initial site assessment
  • Environmental field surveys
  • Cultural resources
  • Environmental re-evaluation
308 days
01/14/08 - 03/18/09
Geotechnical Investigation and Reporting 105 days
01/14/08 – 06/06/08
Pavement Design 30 days
06/09/08 – 07/18/08
Utility Investigation (Designating) 104 days
01/14/08 – 06/05/08
Utility Investigation (Locating) 30 days
08/15/08 – 09/25/08
Funding Certifications 40 days
04/20/09 – 06/12/09
Bidding Phase Services (Duration TBD) 50 days
06/15/08 -08/21/09
Public Involvement Plan 30 days
05/16/08 - 06/26/08
Public Information Meeting (Preliminary Design) Took place August 28, 2008
Public Information Meeting (Pre-Final Design) Took place January 13, 2009
Public Information Meeting (Final Design) Took place April 21, 2009
 
PDF version of project schedule.

Last updated August 6, 2009