Road Work Schedule
Broadmoor Boulevard Reconstruction Week of August 30, 2010
The construction activities scheduled to take place during the week of August 30, 2010, will include:
1) Broadmoor Boulevard between Nicklaus Drive and High Resort Boulevard: Traffic is restricted to one-way, northbound traffic. Please use Chessman Drive, Parkside Road, High Ridge Trail, Panorama Heights, and Nicklaus Drive as detours for southbound traffic.
2) Access at the following streets will be closed at Broadmoor Boulevard through approximately September 18, 2010:
o Seven Falls Drive (Beginning September 2) - please use Chessman Drive, Parkside Road, and High Ridge Trail as detours.
o Panorama Heights - please use Chessman Drive, Parkside Road, High Ridge Trail and Nicklaus Drive as detours.
o Aberdeen Drive - please use Inverness Drive or Greenock Drive as detours to High Resort Boulevard.
o Pinewood Drive - please use Chessman Drive, Parkside Road, High Ridge Trail and Nicklaus Drive as detours.
o Oak Hills Drive - please use Chessman Drive, Parkside Road, High Ridge Trail, Pinewood Drive, and Nicklaus Drive as detours.
o West Island Drive east of Broadmoor Drive - please use Superstition Drive as a detour.
o West Island Drive west of Broadmoor Drive - please use Chessman Drive, High Ridge Trail, and Nicklaus Drive as detours.
o The south end of Chaparral Loop - please use the north access of Chaparral Loop as a detour.
Work hours will be from 7 a.m. to 5 p.m. Please adhere to posted detour routes, speed limits and roadway restrictions. All vehicles need to be removed from street parking and will be towed if left on the street during construction activity hours.
Apache Loop Reconstruction and Waterline Replacement Project Week of August 30, 2010
Continuing to Friday, September 3, 2010, contractor crews will be working on the following streets milling and replacing waterlines: Apache Loop, Pontiac Drive, and Chippewa Court between Chippewa Drive. Work hours will be from 7 a.m. to 5 p.m.
Continuing to Friday, September 29, 2010, contractor crews will be working on the following streets milling and replacing waterlines: Apache Loop, Chippewa Drive, Apache Court, and Iroquois Court between Hondo Road and Pontiac Drive. Work hours will be from 7 a.m. to 5 p.m.
Access on Apache Loop, Pontiac Drive, Chippewa Court, Chippewa Drive, Apache Court, and Iroquois Court will be restricted to one-way traffic.
Please adhere to posted detour routes, speed limits and one-way restrictions. All vehicles need to be removed from street parking and will be towed if left on the street during construction activity hours.
Trash cans need to be placed on the opposite side of the street for waste pick up.
For more information, please leave a message and callback number at (505) 991-3972.
21st Avenue Reconstruction Week of August 30, 2010
Construction activities during the week of August 30, 2010, as part of the project to reconstruct 21st Avenue between Golf Course Road and Grande Boulevard will include:
1) 21st Avenue between Leonard Street and Grande Boulevard: Leonard Street will be closed at the north side of 21st Avenue for the construction of curbs and gutters through approximately August 30. Traffic will be restricted to one-way, westbound traffic between Leonard Street and Grande Boulevard. Please use 20th Avenue as a detour for eastbound traffic.
2) 21st Avenue at Yucca Street: Yucca Street will be closed at the north side of 21st Avenue for the construction of curbs and gutters through approximately August 30..
Work hours will be from 7 a.m. to 5 p.m. Please adhere to posted detour routes, speed limits and roadway restrictions. All vehicles need to be removed from street parking and will be towed if left on the street during construction activity hours.
For more information on this project, leave your name and callback number for Jamie Marrufo at (505) 891-5043.